Screeds, levellers & floor preparation › Cement screeds SUDAK CHAPE THERMO
Flowing screed for underfloor heating and cooling — high thermal conductivity
- EN 13813
SUDAK Maroc — ISO 9001:2015 certified company (SGS) · see the scope
SUDAK CHAPE THERMO is a fibre-reinforced, self-levelling flowing screed in powder form, formulated for encasing hot-water underfloor heating or cooling pipes and electric heating cables. Its dense, low-entrapped-air formulation based on silica sands ensures complete, void-free encasement and excellent heat distribution, with a reduced thickness above the pipes.
Applications
- Hydronic underfloor heating (low-temperature systems) and underfloor cooling.
- Electric underfloor heating (cables and mats).
- Floating screed on insulation in housing, hotels, offices and healthcare facilities.
- Minimum cover of 30 mm above the pipes; typical total thickness 45–70 mm.
Benefits
- High thermal conductivity: faster warm-up and energy savings.
- Perfect encasement of pipes, with no air voids.
- Fibre-reinforced: good resistance to cracking under thermal cycling.
- Reduced thickness compared with a traditional screed (6–7 cm): savings in load and height.
- Gradual heating can start from 7 days.
Technical specifications
| EN 13813 class | CT-C30-F6 |
|---|---|
| Appearance | Fibre-reinforced grey powder |
| Max. particle size | 2.0 mm |
| Mixing water | 3.75 to 4.0 L per 25 kg bag (15–16 %) |
| Flow (ring Ø 30 × 50 mm) | 150–160 mm |
| Entrapped air | < 2 % |
| Hardened density | ≈ 2.15 kg/L |
| Thermal conductivity λ | ≥ 1.3 W/m·K |
| Fibres | Microfilament polypropylene |
| Compressive strength at 28 d | ≥ 30 MPa |
| Flexural strength at 28 d | ≥ 6 MPa |
| Walkable | 24 h |
Typical values obtained in the laboratory at 20 °C and 65 % RH. They may vary depending on site conditions.
Standards / Classification
- EN 13813: screed materials – properties and requirements.
Packaging
- 25 kg bag.
Storage
12 months in the original sealed packaging, protected from moisture and frost, on pallets.
Application
Substrate preparation
- Insulation boards laid tightly butted, covered with a 150 µm watertight polyethylene sheet turned up at the perimeter (10 cm overlap, taped joints).
- 8–10 mm compressible perimeter strip over the full height of the screed.
- Pipes fixed and weighted down to prevent floating; circuit filled with water and pressurised (≥ 3 bar) during pouring.
- Mark the finished level with tripods or a laser level.
Application
- Mix for 3 minutes with an electric mixer or use a continuous mixing pump; strictly observe the water dosage.
- Pour starting from the furthest point, in strips of 5–6 m.
- Spike roll or dapple with a bar immediately after pouring.
- Protect from draughts and sunlight for 48 h.
- Initial heating: from 7 d, start at 25 °C maintained for 3 d, then +5 °C per day up to the maximum operating temperature, maintained for 4 d; then reduce gradually before laying the floor covering.
Dosage / Consumption
Approximately 1.9 kg of powder per m² per mm of thickness (i.e. approximately 95 kg/m² for 50 mm).
Health and safety
Product contains cement: irritant. Wear gloves and goggles. Refer to the Safety Data Sheet (SDS).