SUDAK Maroc SUDAK Maroc

Application

Flat-roof waterproofing: best practices

Équipe technique SUDAK

Substrate preparation, membrane choice, detailing: achieving durable waterproofing in the Moroccan climate.

A well-waterproofed flat roof protects the building for the long term. Success comes down to three factors: substrate preparation, system choice and the treatment of detailing points.

Preparing the substrate

The substrate must be clean, sound, dry and have sufficient drainage falls. Cracks are treated before application.

Detailing points

Upstands, drains, expansion joints: these are the most exposed areas. They require systematic reinforcement.

All articles

Estimate my needs

Cookie preferences

Necessary Always active

Remember your cookie choice (6 months). No personal data.

Audience measurement (Google Analytics 4) Off

Traffic statistics (page views, sources, clicks on contact buttons). Set only after your consent, kept 6 months at most.